
Projects Cost Management, Estimating, Budgeting and Control.
Learn how to estimate costs for any project, how to determine budget and how to use Earned Value Management tools. 3 PDU
Language: english
Note: 3.9/5 (1,004 notes) 70,324 students
Instructor(s): Saad Almeri
Last update: 2020-07-13
What you’ll learn
- How to estimate costs for a project
- How to determine project budget
- How to control project costs
- How to use Earned Value Management indicators
Requirements
- No prerequisites
Description
This course consist of two parts. The fist part is a theoretical explanation based on the cost management chapter from PMBOK (the book that is used for PMP certificate) and the second part is a practical example about how to apply the theoretical part..
Both parts talk about three main topics:
How to estimate costs for activities in the project, which also include:
Types of Costs
Estimating costs tools and techniques.
Handling Risk Reserves costs
Cost of Quality
Documenting the costs basis of estimates
How to determine project budget, which also include:
Determine cost baseline
Estimate funding requirements
Determine project budget
How to Control Project Costs, through:
Using Earned Value Management Techniques to assess project performance
Calculating CPI, SPI, CV, SV
Forecasting project costs y using Earned Value Management Tools
Who this course is for
- Engineering and IT practitioners
- Anyone interrested in project management
Course content
- Introduction
- Introduction
- Theoritical Part
- What is Cost Management?
- Direct and Indirect Costs
- Analogous Estimating
- Parametric Estimation
- Three-Point Estimating
- Reserve Analysis
- Cost Estimates and Basis of Estimates
- Cost Baseline
- Funding Requirements
- Earned Value Formulas
- Project Status
- Earned Value Example
- Forecasting Three Scenarios
- Forecasting Example
- To-Complete-Performance-Index TCPI
- Performance Reviews
- Recap
- Project Simulation and Detailed Example
- Direct and Indirect Costs
- Cost Estimates and Reserve Analysis
- Cost Baseline and Project Budget
- Basis of Estimate
- Funding Requirements
- Earned Value Calculation
- Forecasting
- TCPI
Time remaining or 988 enrolls left
Don’t miss any coupons by joining our Telegram group |